Go to Homepage    Send a mail    News   

General engineering ° Refrigeration ° Air conditioning ° Insulation ° Ventilation

Design, 

FEL1, FEL2, 

Process Hazard Analisys, Safety considerations, 

engineering, specification, tender

 

Customers

 AmecSpie ° Archivision ° BnS engineering ° Costan Refrigeration

DuPont de Nemours ° Belgian Scrap Terminal ° ClimaConstruct  ° Indicator

Fina ° Gedas ° GTI ° Kemira ° Mycom Europe ° Oleon ° P&G ° STC ° Vitech ° Zephyr

 

Projects

Industrial refrigeration plants

Air conditioning

Computerrooms

New R&D labs

Insulation of a 15.000 ton NH3 storage tank

Air conditioning in an 3 stories office building

HVAC in production hall

Ventilation of locker and shower rooms

Automatic filling, labelling, packaging and palletising line

Barcode labelling of boxes and pallets

Indoor Air Quality

Calculation of diluation ventilation for Hazardous Areas (Ex)

 

 

Industrial refrigeration plants

Design and engineering of industrial refrigeration plants halocarbons (HCFC and HFC) and ammonia (NH3) for food processing, slaughterhouses and process installations.

References: l'Ardennaise, Kunstijsbaan Turnhout, Lonki, Mora, Pieters visbedrijf, ...

 

Air conditioning

Design and engineering for comfort and process air conditioning installations for private rooms, offices, production areas.

References: AMI, GoodYear, Fabrimetal Antwerpen, Ford Antwerpen, Hörmann, Shell, Shopping Center Wijnegem, ...

 

Computerrooms

Design for Turn-key projects of computerrooms from 4 m² up to 1000 m².

Air conditioning, waterchillers, raised floors, suspended ceilings, electrical distribution panels, no-break / UPS, fire extinguishing, entrance control, ...

References: Agfa-Gevaert, BP, CIPAL, Colruyt, DuPont, Eternit, Fabrimetal, Ford Motor Company, Makro, Procter & Gamble, Havenbedrijf, OCMW Antwerpen, Sidal, Sony,  Stad Antwerpen, Teepak, Unilever ...

 

Refurbishment of R&D lab

Refurbishment of a 300 m² lab for Oleon.

New installation of HVAC including electrical installation.

Total installed airflow approx. 13000 m³/h

Total installed heating capacity 159 kW (steam)

Project budget: approx 9.000,00 € (2002)

Timing: 2 months

 

Automatic filling, labelling, packaging and palletising line

Design and engineering of a new automatic filling line for clear coats (DuPont Performance Coatings).

Semi-automatic depalletiser for metal containers (1 - 5 l), Ex-proof full automatic rotary filler with a capacity of 6000 l/h for 7 can sizes, automatic capper for 3 different caps and 2 sizes of lids, automatic labeling machine for round and rectangular cans, inkjet printer for application of batchnumber, packaging machine for 7 sizes of cardboard boxes, automatic label applicator for boxes, robot palletiser with two palletising stations, can, boxes and palet conveyors.

Project budget: approx 1.750.000,00 € (2001-2002)

Timing: 18 months

 

This site is best viewed with IE5.0 640x800.

Webdesign KAVEE ©2004, all rights reserved.